Briarcliff Corridor Water Infrastructure Replacement Project Begins Sept. 22

/, Recent-News-Updates/Briarcliff Corridor Water Infrastructure Replacement Project Begins Sept. 22

Briarcliff Corridor Water Infrastructure Replacement Project Begins Sept. 22

2019-09-19T21:31:54+00:00September 19th, 2019|All News, Recent-News-Updates|0 Comments

On Sunday, September 22nd, repair work will begin for the Briarcliff Corridor Water Infrastructure Replacement Project. The project includes replacing 44,500 feet of water main in the Briarcliff Road/North Decatur Road area.

Authorized contractors will install 12-inch or 8-inch ductile iron pipe within the road right of way with a single lane closure in place as work progresses. Work is expected to last approximately 24 months, unless unforeseen circumstances arise. Normal construction hours will be from 9:00 a.m. to 3:00 p.m., Monday – Friday. Construction in Emory Village area will be from 9:00 p.m. to 5:00 a.m., Sunday – Thursday.

Residents should review existing plumbing infrastructure to ensure plumbing meets current code standards.

For more information, visit the project page at www.dekalbcountyga.gov/briarcliffproject, call 1-800-986-1108 or email [email protected].

Leave A Comment